Caravan Disconnect & Reconnect

Need a quote? Call us

01797 740231

Before your static caravan can be loaded onto a low loader – or settled onto its new pitch – the gas, electricity and water must be safely disconnected and, once it arrives, reconnected and signed off. This is specialised, regulated work that sits outside what a transport crew can legally do. Understanding who arranges it, and when, is one of the most important things to sort early in any caravan move.

Cabin unit being craned during a Static Caravan Movers transport job

Why Utility Disconnection & Reconnection Is a Separate Job

Static caravans are carried as abnormal loads on specialist low loaders – but before the crew can lift and load the unit, all live services must be made safe by a suitably qualified tradesperson. This is not a legal grey area: gas work on a static caravan requires a Gas Safe registered engineer who holds the specific ACS leisure-accommodation qualifications (CCLP1 or CoNGLP1 for LPG, plus the LAV & RPH modules). Electrical disconnection and reconnection must be carried out by a competent electrician working to current wiring regulations. Water connections must similarly meet current British Standards.

Static Caravan Movers handles transport, de-siting and re-siting, route planning and all abnormal-load permits – but we do not carry out certified utility work, and we are not liable for it. The responsibility for arranging qualified tradespeople sits with you, the customer.

What Needs Disconnecting – and Who Does It

Three services need to be made safe before your caravan can be moved. Each has its own qualification requirement.

Gas

Gas work on a static caravan can only be carried out by a Gas Safe registered engineer who holds the appropriate leisure-accommodation ACS qualifications. Many parks require proof of this for any work on-site. If your park insists that only their own approved engineer may disconnect the supply, that rule applies – check your pitch licence or ask the park office early. Do not assume your domestic gas engineer is automatically qualified for static-caravan LPG work; the modules are different.

Electricity

The pitch supply must be safely isolated before loading. A qualified electrician should disconnect the caravan from the park’s supply, cap connections and, on delivery, test and certify the reconnection at the new pitch. Some residential parks (BS 3632-rated sites) require an Electrical Installation Condition Report (EICR) before they will connect a newly arrived unit to their network.

Water

Cold-water supply connections must be made by someone qualified in plumbing to current legislation and British Standards. On older parks, the stop valve may be under a cover in the pitch itself – worth locating and checking it operates freely well before move day.

Who Arranges the Tradespeople?

You do. You need to arrange and pay for the Gas Safe engineer, electrician and plumber independently of your transport booking. Some parks allow you to bring your own contractors; others insist on their own maintenance team and charge a separate fee. Check your pitch licence and speak to the park office at least four weeks before your planned move date. See our step-by-step guide to moving a static caravan for the full picture.

Skirting, Decking & Steps

Skirting and decking panels must be removed before de-siting so the jacking equipment can get underneath. Customers usually arrange this themselves, or the park charges a separate groundswork fee. We can price skirting removal on request – just mention it when you ask for a quote.

The Full Sequence: What Happens When

StepWho arranges itWhen
Check park rules on contractors & disconnectionYou4–6 weeks before
Book Gas Safe engineer & electricianYou2–4 weeks before
Arrange skirting & decking removalYou / parkDay before or move day
Utility disconnection signed offQualified tradespeopleMorning of move
De-siting, loading & transportStatic Caravan MoversMove day
Delivery, siting & levellingStatic Caravan MoversMove day / next day
Utility reconnection & sign-offYou (qualified tradespeople)After siting

Transport starts from £950, and de-siting and re-siting typically costs £300–£1,200 for a standard single unit. Get quotes from your Gas Safe engineer and electrician at the same time as you request your transport quote so you have the full cost picture before committing.

Frequently Asked Questions

Does Static Caravan Movers disconnect or reconnect the utilities?

No. We handle transport, de-siting and re-siting – the physical lifting, moving and levelling of your unit. Certified gas, electrical and water work must be carried out by suitably qualified tradespeople. We are not liable for utility connections or their sign-off.

Does my park have to disconnect the gas, or can I use my own engineer?

It depends on your pitch licence. Some parks insist that only their approved contractors or their own maintenance team carry out disconnection, and they may charge a fee for this. Others allow you to bring in your own Gas Safe registered engineer. Check your licence conditions and speak to the park office as early as possible.

What qualifications does a gas engineer need for static caravan work?

Gas Safe registration alone is not sufficient. Engineers working on static caravans need the specific ACS leisure-accommodation modules – typically CCLP1 or CoNGLP1 (LPG) plus the LAV & RPH qualifications – in addition to registration. Always ask to see the engineer’s Gas Safe card and check the categories listed on it before work starts.

Can the caravan be loaded before the utilities are disconnected?

No. All live services must be made safe and signed off before the transport crew can begin de-siting and loading. If disconnection is delayed on the day, it delays the whole job – and, depending on scheduling, could push the move to another date. Book your tradespeople well ahead of the transport date.

Does this apply to twin-unit homes too?

Yes. A twin-unit home moves as two separate halves, each needing utilities disconnected before loading. On arrival, the halves are rejoined, resealed and made watertight by our siting team – but utility reconnection and sign-off still falls to your qualified tradespeople.